Solar plant: site data

Solar power plant in Chornukhy, Lubenskyi Raion, Poltava Oblast

Chornukhy: 1,138 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,142). #108 of 346 in the rayon, #1131 of 1856 in the oblast.

Lubny, the rayon centre, is 29 km away. 114 m above sea level. 29 km away: Lubny, the nearest bigger centre, 1,146 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 111 km. 12.62 m between rows, pitch 16.39 m (latitude 50.3°).

Yield of 1 kWp
1,138kWh/year
Tilt
38°1° east of south
10 kW
11,383kWh/year
Row pitch
16.39m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Chornukhy

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 111 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan59Feb97Mar118Apr140May142Jun146Jul143Aug113Sep81Oct37Nov26Dec

July: 146 kWh/kWp, December: 26 — 5.6 times less.

January: 37 against 35 in the oblast, 5.7% more.

Chornukhy: plants, kWh
kWpA yearJulyDecember
55,692730130
1011,3831,460260
1517,0752,190390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.