Solar plant: site data

Solar power plant in Cherkashchany, Myrhorodskyi Raion, Poltava Oblast

Cherkashchany: 1,126 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.3% below the oblast median (1,142). #306 of 430 in the rayon, #1654 of 1856 in the oblast.

Myrhorod, the rayon centre, is 25 km away. 145 m above sea level. 25 km away: Myrhorod, the nearest bigger centre, 1,133 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 98 km. 12.26 m between rows, pitch 16.08 m (latitude 50.2°).

Yield of 1 kWp
1,126kWh/year
Tilt
37°1° east of south
10 kW
11,264kWh/year
Row pitch
16.08m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Cherkashchany

The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 98 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan57Feb91Mar118Apr139May143Jun147Jul146Aug113Sep81Oct36Nov23Dec

July: 147 kWh/kWp, December: 23 — 6.4 times less.

January: 32 against 35 in the oblast, 8.6% less.

Cherkashchany: plants, kWh
kWpA yearJulyDecember
55,632735115
1011,2641,470230
1516,8962,205345

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.