Solar power plant in Cheremushky, Kremenchutskyi Raion, Poltava Oblast
Cheremushky: 1,172 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.7% above the oblast median (1,142). #62 of 329 in the rayon, #85 of 1856 in the oblast.
Kremenchuk, the rayon centre, is 32 km away. 83 m above sea level. 29 km away: Kobelyaky, the nearest bigger centre, 1,164 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Полтава, 80 km. 11.25 m between rows, pitch 15.07 m (latitude 49.0°).
- Yield of 1 kWp
- 1,172kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,723kWh/year
- Row pitch
- 15.07m · GCR 0.32
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,450 / 470Pa
Ground frame designer
A ground frame for a solar plant: Cheremushky
The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 80 km: snow 1,450 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 149 kWh/kWp, December: 29 — 5.1 times less.
December: 29 against 25 in the oblast, 16.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,862 | 745 | 145 |
| 10 | 11,723 | 1,490 | 290 |
| 15 | 17,585 | 2,235 | 435 |
Example: a 10 kW ground frame
For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Komendantivka4 km1,166 kWh/kWp
- Kolisnyky4 km1,172 kWh/kWp
- Kobeliachok4 km1,171 kWh/kWp
- Motryne4 km1,172 kWh/kWp
- Reduty5 km1,173 kWh/kWp
- Robotivka6 km1,172 kWh/kWp
All places: Kremenchutskyi RaionPoltava Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.