Solar plant: site data

Solar power plant in Chaplyntsi, Kremenchutskyi Raion, Poltava Oblast

Chaplyntsi: 1,145 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,142). #292 of 329 in the rayon, #755 of 1856 in the oblast.

Kremenchuk, the rayon centre, is 60 km away. 83 m above sea level. 36 km away: Velyka Bahachka, the nearest bigger centre, the same 1,144. Snow and wind from the nearest regional centre in the DBN — Полтава, 88 km. 11.72 m between rows, pitch 15.54 m (latitude 49.6°).

Yield of 1 kWp
1,145kWh/year
Tilt
37°2° east of south
10 kW
11,446kWh/year
Row pitch
15.54m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Chaplyntsi

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 88 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan52Feb92Mar120Apr140May144Jun147Jul147Aug118Sep86Oct40Nov26Dec

July: 147 kWh/kWp, December: 26 — 5.7 times less.

February: 52 against 56 in the oblast, 7.1% less.

Chaplyntsi: plants, kWh
kWpA yearJulyDecember
55,723735130
1011,4461,470260
1517,1692,205390

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kremenchutskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.