Solar plant: site data

Solar power plant in Brovarky, Myrhorodskyi Raion, Poltava Oblast

Brovarky: 1,118 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 2.1% below the oblast median (1,142). #402 of 430 in the rayon, #1827 of 1856 in the oblast.

Myrhorod, the rayon centre, is 58 km away. 140 m above sea level. 5 km away: Hadyach, the nearest bigger centre, the same 1,120. Snow and wind from the nearest regional centre in the DBN — Суми, 78 km. 12.75 m between rows, pitch 16.52 m (latitude 50.4°).

Yield of 1 kWp
1,118kWh/year
Tilt
38°2° east of south
10 kW
11,179kWh/year
Row pitch
16.52m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Brovarky

The designer opens with this place’s coordinates, latitude 50.4° for the row spacing and the DBN loads of the nearest regional centre — Суми, 78 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan58Feb96Mar116Apr138May139Jun143Jul142Aug111Sep78Oct37Nov24Dec

July: 143 kWh/kWp, December: 24 — 6.0 times less.

October: 78 against 84 in the oblast, 7.1% less.

Brovarky: plants, kWh
kWpA yearJulyDecember
55,590715120
1011,1791,430240
1516,7692,145360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.