Solar plant: site data

Solar power plant in Bilenchenkivka, Myrhorodskyi Raion, Poltava Oblast

Bilenchenkivka: 1,129 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.2% below the oblast median (1,142). #270 of 430 in the rayon, #1573 of 1856 in the oblast.

Myrhorod, the rayon centre, is 50 km away. 147 m above sea level. 5 km away: Hadyach, the nearest bigger centre, 1,120 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 87 km. 12.43 m between rows, pitch 16.25 m (latitude 50.4°).

Yield of 1 kWp
1,129kWh/year
Tilt
37°2° east of south
10 kW
11,285kWh/year
Row pitch
16.25m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Bilenchenkivka

The designer opens with this place’s coordinates, latitude 50.4° for the row spacing and the DBN loads of the nearest regional centre — Суми, 87 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan59Feb97Mar117Apr139May142Jun145Jul144Aug111Sep79Oct36Nov24Dec

July: 145 kWh/kWp, December: 24 — 6.0 times less.

November: 36 against 39 in the oblast, 7.7% less.

Bilenchenkivka: plants, kWh
kWpA yearJulyDecember
55,643725120
1011,2851,450240
1516,9282,175360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.