Solar plant: site data

Solar power plant in Berbenytsi, Myrhorodskyi Raion, Poltava Oblast

Berbenytsi: 1,125 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.5% below the oblast median (1,142). #335 of 430 in the rayon, #1722 of 1856 in the oblast.

Myrhorod, the rayon centre, is 69 km away. 136 m above sea level. 47 km away: Pryluky, the nearest bigger centre, 1,116 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 130 km. 12.52 m between rows, pitch 16.34 m (latitude 50.4°).

Yield of 1 kWp
1,125kWh/year
Tilt
37°2° east of south
10 kW
11,247kWh/year
Row pitch
16.34m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Berbenytsi

The designer opens with this place’s coordinates, latitude 50.4° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 130 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan56Feb96Mar118Apr139May142Jun145Jul142Aug112Sep80Oct36Nov23Dec

July: 145 kWh/kWp, December: 23 — 6.3 times less.

December: 23 against 25 in the oblast, 8.0% less.

Berbenytsi: plants, kWh
kWpA yearJulyDecember
55,624725115
1011,2471,450230
1516,8712,175345

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.