Poland: solar plant site data

Solar power plant in Tomaszów Mazowiecki, Poland: yield, tilt angle and row spacing

Tomaszów Mazowiecki: 1,059 kWh per kWp a year at the optimal tilt of 39°, 3° east of south (PVGIS). 0.6% below the median of the main cities of Poland (1,065). #53 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 4.9% less here.

Tomaszów Mazowiecki is in Łódź Voivodeship. Population 67,197 (GeoNames). 164 m above sea level. 25 km away: Piotrkow Trybunalski, the nearest bigger city, 1,069 kWh/kWp — 0.9% less here. 14.32 m between rows, pitch 18.04 m, GCR 0.27 (latitude 51.5°).

Yield of 1 kWp
1,059kWh/year
Tilt
39°3° east of south
10 kW
10,590kWh/year
Row pitch
18.04m · GCR 0.27
Rank in the country
53of 87 cities

Ground frame designer

A ground frame for a solar plant: Tomaszów Mazowiecki

Latitude 51.5°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan54Feb93Mar118Apr128May130Jun128Jul123Aug106Sep76Oct37Nov30Dec

June: 130 kWh/kWp, December: 30 — 4.3 times less.

November: 37 against the median of 41 for the main cities of Poland, 9.8% less.

Tomaszów Mazowiecki: plants, kWh
kWpA yearJuneDecember
55,295650150
1010,5901,300300
1515,8851,950450

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Poland: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.