Solar power plant in Krakow, Poland: yield, tilt angle and row spacing

Krakow: 1,085 kWh per kWp a year at the optimal tilt of 39°, 1° east of south (PVGIS). 1.9% above the median of the main cities of Poland (1,065). #16 of 87 main cities of Poland by yield. For comparison, Kyiv: 1,114 kWh/kWp — 2.6% less here.

Krakow is in Lesser Poland Voivodeship. Population 816,614 (GeoNames). 219 m above sea level. 252 km away: Warsaw, the nearest bigger city, 1,053 kWh/kWp — 3.1% more here. 12.70 m between rows, pitch 16.42 m, GCR 0.29 (latitude 50.1°).

Yield of 1 kWp
1,085kWh/year
Tilt
39°1° east of south
10 kW
10,850kWh/year
Row pitch
16.42m · GCR 0.29
Rank in the country
16of 87 cities

Ground frame designer

A ground frame for a solar plant: Krakow

Latitude 50.1°: the tilt and the row pitch follow it. Enter the snow and wind for Poland in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan58Feb97Mar115Apr122May125Jun130Jul123Aug103Sep82Oct47Nov40Dec

July: 130 kWh/kWp, December: 40 — 3.3 times less.

December: 40 against the median of 32 for the main cities of Poland, 25.0% more.

Krakow: plants, kWh
kWpA yearJulyDecember
55,425650200
1010,8501,300400
1516,2751,950600

Fixed tilt facing south

What a table yields at another tilt than the optimal 39° — for roofs and frames with a standard slope.

Krakow: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
39° (optimum)1,085—
15°1,012−6.7%
30°1,074−1.1%
45°1,081−0.4%
90°775−28.5%

Snow and wind loads

Snow and wind loads for a site in Poland follow PN-EN 1991-1-3 (snow) and PN-EN 1991-1-4 (wind) with the Polish National Annex (NA). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Poland: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.