Solar plant: site data

Solar power plant in Stari Troyany, Izmailskyi Raion, Odesa Oblast

Stari Troyany: 1,276 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 4.5% above the oblast median (1,221). #51 of 52 in the rayon, #199 of 1177 in the oblast.

Izmayil, the rayon centre, is 45 km away. 44 m above sea level. 26 km away: Kiliya, the nearest bigger centre, 1,311 — 2.6% less here. Snow and wind from the nearest regional centre in the DBN — Одеса, 150 km. 9.01 m between rows, pitch 12.83 m (latitude 45.7°).

Yield of 1 kWp
1,276kWh/year
Tilt
37°2° east of south
10 kW
12,761kWh/year
Row pitch
12.83m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Stari Troyany

The designer opens with this place’s coordinates, latitude 45.7° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 150 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

50Jan67Feb112Mar127Apr142May140Jun149Jul150Aug127Sep103Oct60Nov49Dec

August: 150 kWh/kWp, December: 49 — 3.1 times less.

December: 49 against 38 in the oblast, 28.9% more.

Stari Troyany: plants, kWh
kWpA yearAugustDecember
56,381750245
1012,7611,500490
1519,1422,250735

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Izmailskyi RaionOdesa Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.