Solar plant: site data
Solar power plant in Dalnyk, Odeskyi Raion, Odesa Oblast
Dalnyk: 1,314 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 7.7% above the oblast median (1,221). #3 of 154 in the rayon, #21 of 1177 in the oblast.
Odesa, the rayon centre, is 33 km away. 9 m above sea level. 14 km away: Bilhorod-Dnistrovskyi, the nearest bigger centre, 1,288 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Одеса, 32 km. 9.10 m between rows, pitch 12.97 m (latitude 46.2°).
- Yield of 1 kWp
- 1,314kWh/year
- Tilt
- 36°2° west of south
- 10 kW
- 13,142kWh/year
- Row pitch
- 12.97m · GCR 0.37
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 880 / 460Pa
Ground frame designer
A ground frame for a solar plant: Dalnyk
The designer opens with this place’s coordinates, latitude 46.2° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 32 km: snow 880 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 160 kWh/kWp, December: 44 — 3.6 times less.
January: 48 against 40 in the oblast, 20.0% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,571 | 800 | 220 |
| 10 | 13,142 | 1,600 | 440 |
| 15 | 19,713 | 2,400 | 660 |
Example: a 10 kW ground frame
For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.