Solar plant: site data
Solar power plant in Yelanets, Voznesenskyi Raion, Mykolaiv Oblast
Yelanets: 1,182 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.3% below the oblast median (1,198). #187 of 252 in the rayon, #670 of 909 in the oblast.
Voznesensk, the rayon centre, is 41 km away. 73 m above sea level. 41 km away: Voznesensk, the nearest bigger centre, 1,192 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 81 km. 10.00 m between rows, pitch 13.87 m (latitude 47.7°).
- Yield of 1 kWp
- 1,182kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 11,821kWh/year
- Row pitch
- 13.87m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Yelanets
The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 81 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 154 kWh/kWp, December: 31 — 5.0 times less.
December: 31 against 33 in the oblast, 6.1% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,911 | 770 | 155 |
| 10 | 11,821 | 1,540 | 310 |
| 15 | 17,732 | 2,310 | 465 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Velidarivka3 km1,186 kWh/kWp
- Krutoiarka4 km1,183 kWh/kWp
- Kamyanka6 km1,186 kWh/kWp
- Novo-Yavlenka7 km1,185 kWh/kWp
- Buhorok8 km1,187 kWh/kWp
- Maloukrayinka8 km1,191 kWh/kWp
All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.