Solar plant: site data

Solar power plant in Vyshneve, Pervomaiskyi Raion, Mykolaiv Oblast

Vyshneve: 1,186 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.0% below the oblast median (1,198). #2 of 140 in the rayon, #602 of 909 in the oblast.

Pervomaysk, the rayon centre, is 50 km away. 136 m above sea level. 36 km away: Voznesensk, the nearest bigger centre, the same 1,192. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 92 km. 10.12 m between rows, pitch 13.99 m (latitude 47.9°).

Yield of 1 kWp
1,186kWh/year
Tilt
36°4° east of south
10 kW
11,864kWh/year
Row pitch
13.99m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Vyshneve

The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 92 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan53Feb99Mar123Apr139May140Jun152Jul148Aug122Sep94Oct46Nov33Dec

July: 152 kWh/kWp, December: 33 — 4.6 times less.

November: 46 against 48 in the oblast, 4.2% less.

Vyshneve: plants, kWh
kWpA yearJulyDecember
55,932760165
1011,8641,520330
1517,7962,280495

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.