Solar power plant in Vozsiyatske, Voznesenskyi Raion, Mykolaiv Oblast
Vozsiyatske: 1,188 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.8% below the oblast median (1,198). #137 of 252 in the rayon, #584 of 909 in the oblast.
Voznesensk, the rayon centre, is 59 km away. 75 m above sea level. 30 km away: Novyi Buh, the nearest bigger centre, 1,181 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 77 km. 9.98 m between rows, pitch 13.85 m (latitude 47.7°).
- Yield of 1 kWp
- 1,188kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 11,879kWh/year
- Row pitch
- 13.85m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Vozsiyatske
The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 77 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 154 kWh/kWp, December: 32 — 4.8 times less.
January: 35 against 38 in the oblast, 7.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,940 | 770 | 160 |
| 10 | 11,879 | 1,540 | 320 |
| 15 | 17,819 | 2,310 | 480 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Semenivka4 km1,196 kWh/kWp
- Pryyut5 km1,188 kWh/kWp
- Kovalivka6 km1,192 kWh/kWp
- Novomykolayivka8 km1,185 kWh/kWp
- Olhopil8 km1,187 kWh/kWp
- Mayiske8 km1,184 kWh/kWp
All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.