Vorontsivka: 1,215 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.5% above the oblast median (1,198). #210 of 238 in the rayon, #292 of 909 in the oblast.

Mykolayiv, the rayon centre, is 35 km away. 79 m above sea level. 23 km away: Nova Odesa, the nearest bigger centre, the same 1,212. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 35 km. 9.73 m between rows, pitch 13.60 m (latitude 47.3°).

Yield of 1 kWp
1,215kWh/year
Tilt
36°4° east of south
10 kW
12,153kWh/year
Row pitch
13.60m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Vorontsivka

The designer opens with this place’s coordinates, latitude 47.3° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 35 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan56Feb103Mar126Apr141May141Jun153Jul150Aug126Sep97Oct49Nov34Dec

July: 153 kWh/kWp, December: 34 — 4.5 times less.

February: 56 against 54 in the oblast, 3.7% more.

Vorontsivka: plants, kWh
kWpA yearJulyDecember
56,077765170
1012,1531,530340
1518,2302,295510

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.