Solar plant: site data
Solar power plant in Tsvitkove, Voznesenskyi Raion, Mykolaiv Oblast
Tsvitkove: 1,196 kWh per kWp a year, tilt 36° 5° east of south (PVGIS). Exactly the oblast median (1,198). #87 of 252 in the rayon, #477 of 909 in the oblast.
Voznesensk, the rayon centre, is 14 km away. 8 m above sea level. 14 km away: Voznesensk, the nearest bigger centre, the same 1,192. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 95 km. 9.96 m between rows, pitch 13.83 m (latitude 47.6°).
- Yield of 1 kWp
- 1,196kWh/year
- Tilt
- 36°5° east of south
- 10 kW
- 11,964kWh/year
- Row pitch
- 13.83m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Tsvitkove
The designer opens with this place’s coordinates, latitude 47.6° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 95 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 34 — 4.4 times less.
January: 40 against 38 in the oblast, 5.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,982 | 755 | 170 |
| 10 | 11,964 | 1,510 | 340 |
| 15 | 17,946 | 2,265 | 510 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Akmechetski Stavki3 km1,199 kWh/kWp
- Bouzke4 km1,205 kWh/kWp
- Ptyche4 km1,194 kWh/kWp
- Prybuzhzhya6 km1,199 kWh/kWp
- Novokantakuzivka6 km1,196 kWh/kWp
- Zabary8 km1,189 kWh/kWp
All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.