Solar plant: site data

Solar power plant in Troyitske, Voznesenskyi Raion, Mykolaiv Oblast

Troyitske: 1,204 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,198). #42 of 252 in the rayon, #381 of 909 in the oblast.

Voznesensk, the rayon centre, is 26 km away. 64 m above sea level. 21 km away: Nova Odesa, the nearest bigger centre, 1,212 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 62 km. 9.86 m between rows, pitch 13.73 m (latitude 47.5°).

Yield of 1 kWp
1,204kWh/year
Tilt
36°3° east of south
10 kW
12,036kWh/year
Row pitch
13.73m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Troyitske

The designer opens with this place’s coordinates, latitude 47.5° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 62 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan57Feb102Mar124Apr139May140Jun151Jul148Aug124Sep96Oct49Nov34Dec

July: 151 kWh/kWp, December: 34 — 4.4 times less.

February: 57 against 54 in the oblast, 5.6% more.

Troyitske: plants, kWh
kWpA yearJulyDecember
56,018755170
1012,0361,510340
1518,0542,265510

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.