Solar plant: site data
Solar power plant in Timiryazyevka, Voznesenskyi Raion, Mykolaiv Oblast
Timiryazyevka: 1,204 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,198). #41 of 252 in the rayon, #380 of 909 in the oblast.
Voznesensk, the rayon centre, is 16 km away. 91 m above sea level. 16 km away: Voznesensk, the nearest bigger centre, 1,192 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 71 km. 9.82 m between rows, pitch 13.69 m (latitude 47.4°).
- Yield of 1 kWp
- 1,204kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 12,037kWh/year
- Row pitch
- 13.69m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Timiryazyevka
The designer opens with this place’s coordinates, latitude 47.4° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 71 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 36 — 4.2 times less.
December: 36 against 33 in the oblast, 9.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,019 | 755 | 180 |
| 10 | 12,037 | 1,510 | 360 |
| 15 | 18,056 | 2,265 | 540 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Kamyana Balka1 km1,204 kWh/kWp
- Ursolivka2 km1,203 kWh/kWp
- Vokzal4 km1,205 kWh/kWp
- Stepanivka5 km1,201 kWh/kWp
- Martynivske6 km1,199 kWh/kWp
- Kalynivka6 km1,207 kWh/kWp
All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.