Solar plant: site data
Solar power plant in Svitoch, Pervomaiskyi Raion, Mykolaiv Oblast
Svitoch: 1,160 kWh per kWp a year, tilt 36° 5° east of south (PVGIS). 3.2% below the oblast median (1,198). #128 of 140 in the rayon, #897 of 909 in the oblast.
Pervomaysk, the rayon centre, is 18 km away. 111 m above sea level. 13 km away: Vilshanka, the nearest bigger centre, the same 1,158. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 100 km. 10.33 m between rows, pitch 14.20 m (latitude 48.2°).
- Yield of 1 kWp
- 1,160kWh/year
- Tilt
- 36°5° east of south
- 10 kW
- 11,599kWh/year
- Row pitch
- 14.20m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Svitoch
The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 100 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 150 kWh/kWp, December: 29 — 5.2 times less.
November: 42 against 48 in the oblast, 12.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,800 | 750 | 145 |
| 10 | 11,599 | 1,500 | 290 |
| 15 | 17,399 | 2,250 | 435 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.
How these numbers are computed
Nearby
- Tarasivka3 km1,162 kWh/kWp
- Lozuvatka4 km1,157 kWh/kWp
- Shevchenko4 km1,160 kWh/kWp
- Bandurka5 km1,165 kWh/kWp
- Novooleksandrivka6 km1,161 kWh/kWp
- Lysa Hora7 km1,156 kWh/kWp
All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.