Solar plant: site data

Solar power plant in Sukhyi Yelanets, Mykolaivskyi Raion, Mykolaiv Oblast

Sukhyi Yelanets: 1,210 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.0% above the oblast median (1,198). #214 of 238 in the rayon, #322 of 909 in the oblast.

Mykolayiv, the rayon centre, is 44 km away. 51 m above sea level. 18 km away: Nova Odesa, the nearest bigger centre, the same 1,212. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 44 km. 9.79 m between rows, pitch 13.66 m (latitude 47.4°).

Yield of 1 kWp
1,210kWh/year
Tilt
36°3° east of south
10 kW
12,096kWh/year
Row pitch
13.66m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Sukhyi Yelanets

The designer opens with this place’s coordinates, latitude 47.4° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 44 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan55Feb102Mar125Apr140May140Jun154Jul150Aug126Sep97Oct49Nov33Dec

July: 154 kWh/kWp, December: 33 — 4.7 times less.

January: 40 against 38 in the oblast, 5.3% more.

Sukhyi Yelanets: plants, kWh
kWpA yearJulyDecember
56,048770165
1012,0961,540330
1518,1442,310495

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.