Solar plant: site data

Solar power plant in Sukhodil, Mykolaivskyi Raion, Mykolaiv Oblast

Sukhodil: 1,258 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 5.0% above the oblast median (1,198). #65 of 238 in the rayon, #65 of 909 in the oblast.

Mykolayiv, the rayon centre, is 34 km away. 6 m above sea level. 15 km away: Berezanka, the nearest bigger centre, the same 1,260. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 34 km. 9.47 m between rows, pitch 13.34 m (latitude 46.9°).

Yield of 1 kWp
1,258kWh/year
Tilt
36°2° east of south
10 kW
12,578kWh/year
Row pitch
13.34m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Sukhodil

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 34 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan61Feb107Mar130Apr144May143Jun153Jul152Aug129Sep100Oct54Nov39Dec

July: 153 kWh/kWp, December: 39 — 3.9 times less.

January: 45 against 38 in the oblast, 18.4% more.

Sukhodil: plants, kWh
kWpA yearJulyDecember
56,289765195
1012,5781,530390
1518,8672,295585

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.