Solar power plant in Stepove, Pervomaiskyi Raion, Mykolaiv Oblast
Stepove: 1,173 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 2.1% below the oblast median (1,198). #71 of 140 in the rayon, #805 of 909 in the oblast.
Pervomaysk, the rayon centre, is 21 km away. 136 m above sea level. 21 km away: Pervomaysk, the nearest bigger centre, the same 1,169. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 121 km. 10.12 m between rows, pitch 13.99 m (latitude 47.9°).
- Yield of 1 kWp
- 1,173kWh/year
- Tilt
- 36°4° east of south
- 10 kW
- 11,727kWh/year
- Row pitch
- 13.99m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Stepove
The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 121 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 150 kWh/kWp, December: 31 — 4.8 times less.
November: 44 against 48 in the oblast, 8.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,864 | 750 | 155 |
| 10 | 11,727 | 1,500 | 310 |
| 15 | 17,591 | 2,250 | 465 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.
How these numbers are computed
Nearby
- Stepkivka4 km1,172 kWh/kWp
- Trudolyubivka4 km1,180 kWh/kWp
- Zoryane4 km1,178 kWh/kWp
- Volodymyrivka5 km1,180 kWh/kWp
- Kyiv5 km1,177 kWh/kWp
- Sokolivka6 km1,173 kWh/kWp
All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.