Solar plant: site data

Solar power plant in Stepove, Mykolaivskyi Raion, Mykolaiv Oblast

Stepove: 1,222 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.0% above the oblast median (1,198). #197 of 238 in the rayon, #256 of 909 in the oblast.

Mykolayiv, the rayon centre, is 33 km away. 61 m above sea level. 33 km away: Mykolayiv, the nearest bigger centre, 1,253 — 2.5% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 33 km. 9.62 m between rows, pitch 13.49 m (latitude 47.1°).

Yield of 1 kWp
1,222kWh/year
Tilt
36°3° east of south
10 kW
12,222kWh/year
Row pitch
13.49m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Stepove

The designer opens with this place’s coordinates, latitude 47.1° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 33 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan57Feb104Mar126Apr141May142Jun152Jul151Aug127Sep98Oct51Nov35Dec

July: 152 kWh/kWp, December: 35 — 4.3 times less.

November: 51 against 48 in the oblast, 6.3% more.

Stepove: plants, kWh
kWpA yearJulyDecember
56,111760175
1012,2221,520350
1518,3332,280525

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.