Solar power plant in Shevchenko, Voznesenskyi Raion, Mykolaiv Oblast

Shevchenko: 1,196 kWh per kWp a year, tilt 36° facing south (PVGIS). Exactly the oblast median (1,198). #91 of 252 in the rayon, #482 of 909 in the oblast.

Voznesensk, the rayon centre, is 20 km away. 128 m above sea level. 20 km away: Voznesensk, the nearest bigger centre, the same 1,192. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 89 km. 9.87 m between rows, pitch 13.74 m (latitude 47.5°).

Yield of 1 kWp
1,196kWh/year
Tilt
36°facing south
10 kW
11,958kWh/year
Row pitch
13.74m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Shevchenko

The designer opens with this place’s coordinates, latitude 47.5° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 89 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan53Feb101Mar123Apr139May141Jun151Jul148Aug123Sep96Oct48Nov35Dec

July: 151 kWh/kWp, December: 35 — 4.3 times less.

December: 35 against 33 in the oblast, 6.1% more.

Shevchenko: plants, kWh
kWpA yearJulyDecember
55,979755175
1011,9581,510350
1517,9372,265525

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.