Solar plant: site data

Solar power plant in Petrovo-Solonykha, Mykolaivskyi Raion, Mykolaiv Oblast

Petrovo-Solonykha: 1,244 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 3.9% above the oblast median (1,198). #106 of 238 in the rayon, #109 of 909 in the oblast.

Mykolayiv, the rayon centre, is 15 km away. 33 m above sea level. 15 km away: Mykolayiv, the nearest bigger centre, 1,253 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 15 km. 9.83 m between rows, pitch 13.65 m (latitude 47.1°).

Yield of 1 kWp
1,244kWh/year
Tilt
37°2° east of south
10 kW
12,442kWh/year
Row pitch
13.65m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Petrovo-Solonykha

The designer opens with this place’s coordinates, latitude 47.1° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 15 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan63Feb106Mar128Apr142May141Jun153Jul151Aug128Sep99Oct53Nov37Dec

July: 153 kWh/kWp, December: 37 — 4.1 times less.

January: 45 against 38 in the oblast, 18.4% more.

Petrovo-Solonykha: plants, kWh
kWpA yearJulyDecember
56,221765185
1012,4421,530370
1518,6632,295555

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.