Solar plant: site data

Solar power plant in Petrivka Persha, Voznesenskyi Raion, Mykolaiv Oblast

Petrivka Persha: 1,172 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 2.1% below the oblast median (1,198). #237 of 252 in the rayon, #813 of 909 in the oblast.

Voznesensk, the rayon centre, is 62 km away. 200 m above sea level. 31 km away: Bobrynets, the nearest bigger centre, the same 1,167. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 64 km. 10.25 m between rows, pitch 14.12 m (latitude 48.1°).

Yield of 1 kWp
1,172kWh/year
Tilt
36°4° east of south
10 kW
11,724kWh/year
Row pitch
14.12m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Petrivka Persha

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 64 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb96Mar122Apr138May141Jun152Jul148Aug122Sep92Oct44Nov31Dec

July: 152 kWh/kWp, December: 31 — 4.9 times less.

November: 44 against 48 in the oblast, 8.3% less.

Petrivka Persha: plants, kWh
kWpA yearJulyDecember
55,862760155
1011,7241,520310
1517,5862,280465

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.