Solar plant: site data

Solar power plant in Petrivka, Bashtanskyi Raion, Mykolaiv Oblast

Petrivka: 1,182 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.4% below the oblast median (1,198). #236 of 279 in the rayon, #679 of 909 in the oblast.

Novyi Buh, the rayon centre, is 8 km away. 90 m above sea level. 8 km away: Novyi Buh, the nearest bigger centre, the same 1,181. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 82 km. 9.95 m between rows, pitch 13.82 m (latitude 47.6°).

Yield of 1 kWp
1,182kWh/year
Tilt
36°4° east of south
10 kW
11,817kWh/year
Row pitch
13.82m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Petrivka

The designer opens with this place’s coordinates, latitude 47.6° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 82 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan51Feb96Mar122Apr138May141Jun154Jul149Aug124Sep95Oct47Nov29Dec

July: 154 kWh/kWp, December: 29 — 5.3 times less.

December: 29 against 33 in the oblast, 12.1% less.

Petrivka: plants, kWh
kWpA yearJulyDecember
55,909770145
1011,8171,540290
1517,7262,310435

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bashtanskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.