Solar power plant in Ostrohirske, Pervomaiskyi Raion, Mykolaiv Oblast

Ostrohirske: 1,179 kWh per kWp a year, tilt 36° 6° east of south (PVGIS). 1.6% below the oblast median (1,198). #32 of 140 in the rayon, #724 of 909 in the oblast.

Pervomaysk, the rayon centre, is 46 km away. 70 m above sea level. 46 km away: Pervomaysk, the nearest bigger centre, 1,169 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Одеса, 136 km. 10.00 m between rows, pitch 13.87 m (latitude 47.7°).

Yield of 1 kWp
1,179kWh/year
Tilt
36°6° east of south
10 kW
11,786kWh/year
Row pitch
13.87m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
880 / 460Pa

Ground frame designer

A ground frame for a solar plant: Ostrohirske

The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Одеса, 136 km: snow 880 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan50Feb98Mar123Apr139May143Jun151Jul147Aug121Sep93Oct45Nov33Dec

July: 151 kWh/kWp, December: 33 — 4.6 times less.

February: 50 against 54 in the oblast, 7.4% less.

Ostrohirske: plants, kWh
kWpA yearJulyDecember
55,893755165
1011,7861,510330
1517,6792,265495

Snow and wind: Одеса

Example: a 10 kW ground frame

For the loads of Odesa: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.