Solar plant: site data
Solar power plant in Orlove Pole, Voznesenskyi Raion, Mykolaiv Oblast
Orlove Pole: 1,166 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 2.6% below the oblast median (1,198). #244 of 252 in the rayon, #864 of 909 in the oblast.
Voznesensk, the rayon centre, is 59 km away. 184 m above sea level. 26 km away: Novoukrayinka, the nearest bigger centre, 1,152 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 78 km. 10.27 m between rows, pitch 14.14 m (latitude 48.1°).
- Yield of 1 kWp
- 1,166kWh/year
- Tilt
- 36°4° east of south
- 10 kW
- 11,664kWh/year
- Row pitch
- 14.14m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,230 / 410Pa
Ground frame designer
A ground frame for a solar plant: Orlove Pole
The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 78 km: snow 1,230 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 32 — 4.7 times less.
January: 34 against 38 in the oblast, 10.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,832 | 755 | 160 |
| 10 | 11,664 | 1,510 | 320 |
| 15 | 17,496 | 2,265 | 480 |
Example: a 10 kW ground frame
For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.
How these numbers are computed
Nearby
- Hryhorivka2 km1,165 kWh/kWp
- Antonivka3 km1,166 kWh/kWp
- Tymofiyivka4 km1,161 kWh/kWp
- Lyudmylivka6 km1,173 kWh/kWp
- Mykhaylo-Zhukove6 km1,172 kWh/kWp
- Stepove8 km1,173 kWh/kWp
All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.