Solar plant: site data

Solar power plant in Novyy Step, Voznesenskyi Raion, Mykolaiv Oblast

Novyy Step: 1,209 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.0% above the oblast median (1,198). #15 of 252 in the rayon, #323 of 909 in the oblast.

Voznesensk, the rayon centre, is 28 km away. 86 m above sea level. 25 km away: Nova Odesa, the nearest bigger centre, the same 1,212. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 57 km. 9.76 m between rows, pitch 13.63 m (latitude 47.3°).

Yield of 1 kWp
1,209kWh/year
Tilt
36°3° east of south
10 kW
12,094kWh/year
Row pitch
13.63m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Novyy Step

The designer opens with this place’s coordinates, latitude 47.3° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 57 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan55Feb102Mar124Apr140May142Jun152Jul149Aug124Sep97Oct49Nov35Dec

July: 152 kWh/kWp, December: 35 — 4.3 times less.

December: 35 against 33 in the oblast, 6.1% more.

Novyy Step: plants, kWh
kWpA yearJulyDecember
56,047760175
1012,0941,520350
1518,1412,280525

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.