Solar plant: site data

Solar power plant in Novoselivka, Mykolaivskyi Raion, Mykolaiv Oblast

Novoselivka: 1,239 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.4% above the oblast median (1,198). #144 of 238 in the rayon, #157 of 909 in the oblast.

Mykolayiv, the rayon centre, is 31 km away. 52 m above sea level. 31 km away: Mykolayiv, the nearest bigger centre, 1,253 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 31 km. 9.56 m between rows, pitch 13.43 m (latitude 47.0°).

Yield of 1 kWp
1,239kWh/year
Tilt
36°3° east of south
10 kW
12,386kWh/year
Row pitch
13.43m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Novoselivka

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 31 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan61Feb106Mar127Apr142May142Jun153Jul151Aug128Sep98Oct53Nov37Dec

July: 153 kWh/kWp, December: 37 — 4.1 times less.

February: 61 against 54 in the oblast, 13.0% more.

Novoselivka: plants, kWh
kWpA yearJulyDecember
56,193765185
1012,3861,530370
1518,5792,295555

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.