Solar plant: site data

Solar power plant in Novopetrivka, Bashtanskyi Raion, Mykolaiv Oblast

Novopetrivka: 1,230 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.6% above the oblast median (1,198). #40 of 279 in the rayon, #220 of 909 in the oblast.

Novyi Buh, the rayon centre, is 71 km away. 44 m above sea level. 11 km away: Snihurivka, the nearest bigger centre, the same 1,232. Snow and wind from the nearest regional centre in the DBN — Херсон, 47 km. 9.59 m between rows, pitch 13.46 m (latitude 47.1°).

Yield of 1 kWp
1,230kWh/year
Tilt
36°3° east of south
10 kW
12,295kWh/year
Row pitch
13.46m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novopetrivka

The designer opens with this place’s coordinates, latitude 47.1° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 47 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan59Feb105Mar125Apr141May143Jun152Jul152Aug128Sep97Oct52Nov36Dec

July: 152 kWh/kWp, December: 36 — 4.2 times less.

February: 59 against 54 in the oblast, 9.3% more.

Novopetrivka: plants, kWh
kWpA yearJulyDecember
56,148760180
1012,2951,520360
1518,4432,280540

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bashtanskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.