Novomykhaylivka: 1,180 kWh per kWp a year, tilt 36° facing south (PVGIS). 1.5% below the oblast median (1,198). #22 of 140 in the rayon, #708 of 909 in the oblast.

Pervomaysk, the rayon centre, is 32 km away. 157 m above sea level. 32 km away: Pervomaysk, the nearest bigger centre, 1,169 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 100 km. 10.16 m between rows, pitch 14.03 m (latitude 47.9°).

Yield of 1 kWp
1,180kWh/year
Tilt
36°facing south
10 kW
11,798kWh/year
Row pitch
14.03m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Novomykhaylivka

The designer opens with this place’s coordinates, latitude 47.9° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 100 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan54Feb98Mar122Apr138May141Jun151Jul147Aug121Sep93Oct44Nov32Dec

July: 151 kWh/kWp, December: 32 — 4.7 times less.

November: 44 against 48 in the oblast, 8.3% less.

Novomykhaylivka: plants, kWh
kWpA yearJulyDecember
55,899755160
1011,7981,510320
1517,6972,265480

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 48,082 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed