Solar plant: site data

Solar power plant in Novomykhaylivka, Mykolaivskyi Raion, Mykolaiv Oblast

Novomykhaylivka: 1,256 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 4.8% above the oblast median (1,198). #67 of 238 in the rayon, #67 of 909 in the oblast.

Mykolayiv, the rayon centre, is 23 km away. 48 m above sea level. 23 km away: Mykolayiv, the nearest bigger centre, the same 1,253. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 23 km. 9.48 m between rows, pitch 13.35 m (latitude 46.9°).

Yield of 1 kWp
1,256kWh/year
Tilt
36°2° east of south
10 kW
12,557kWh/year
Row pitch
13.35m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Novomykhaylivka

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 23 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan61Feb108Mar130Apr144May143Jun153Jul152Aug129Sep100Oct54Nov38Dec

July: 153 kWh/kWp, December: 38 — 4.0 times less.

January: 44 against 38 in the oblast, 15.8% more.

Novomykhaylivka: plants, kWh
kWpA yearJulyDecember
56,279765190
1012,5571,530380
1518,8362,295570

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.