Solar plant: site data

Solar power plant in Novobohdanivka, Mykolaivskyi Raion, Mykolaiv Oblast

Novobohdanivka: 1,258 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 5.0% above the oblast median (1,198). #64 of 238 in the rayon, #64 of 909 in the oblast.

Mykolayiv, the rayon centre, is 12 km away. 36 m above sea level. 12 km away: Mykolayiv, the nearest bigger centre, the same 1,253. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 11 km. 9.70 m between rows, pitch 13.52 m (latitude 46.9°).

Yield of 1 kWp
1,258kWh/year
Tilt
37°2° east of south
10 kW
12,579kWh/year
Row pitch
13.52m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Novobohdanivka

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 11 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan65Feb108Mar129Apr143May141Jun152Jul152Aug129Sep100Oct54Nov39Dec

July: 152 kWh/kWp, December: 39 — 3.9 times less.

January: 48 against 38 in the oblast, 26.3% more.

Novobohdanivka: plants, kWh
kWpA yearJulyDecember
56,290760195
1012,5791,520390
1518,8692,280585

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.