Solar plant: site data

Solar power plant in Mykilske, Voznesenskyi Raion, Mykolaiv Oblast

Mykilske: 1,182 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.3% below the oblast median (1,198). #185 of 252 in the rayon, #667 of 909 in the oblast.

Voznesensk, the rayon centre, is 36 km away. 88 m above sea level. 36 km away: Voznesensk, the nearest bigger centre, 1,192 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 91 km. 10.05 m between rows, pitch 13.92 m (latitude 47.8°).

Yield of 1 kWp
1,182kWh/year
Tilt
36°4° east of south
10 kW
11,824kWh/year
Row pitch
13.92m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Mykilske

The designer opens with this place’s coordinates, latitude 47.8° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 91 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan52Feb98Mar123Apr138May141Jun153Jul149Aug122Sep94Oct46Nov32Dec

July: 153 kWh/kWp, December: 32 — 4.8 times less.

January: 36 against 38 in the oblast, 5.3% less.

Mykilske: plants, kWh
kWpA yearJulyDecember
55,912765160
1011,8241,530320
1517,7362,295480

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.