Solar plant: site data

Solar power plant in Katerynivka, Mykolaivskyi Raion, Mykolaiv Oblast

Katerynivka: 1,217 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.6% above the oblast median (1,198). #207 of 238 in the rayon, #281 of 909 in the oblast.

Mykolayiv, the rayon centre, is 46 km away. 72 m above sea level. 22 km away: Nova Odesa, the nearest bigger centre, the same 1,212. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 47 km. 9.70 m between rows, pitch 13.57 m (latitude 47.2°).

Yield of 1 kWp
1,217kWh/year
Tilt
36°3° east of south
10 kW
12,170kWh/year
Row pitch
13.57m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Katerynivka

The designer opens with this place’s coordinates, latitude 47.2° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 47 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan57Feb103Mar125Apr141May142Jun152Jul149Aug126Sep97Oct51Nov35Dec

July: 152 kWh/kWp, December: 35 — 4.3 times less.

November: 51 against 48 in the oblast, 6.3% more.

Katerynivka: plants, kWh
kWpA yearJulyDecember
56,085760175
1012,1701,520350
1518,2552,280525

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.