Solar plant: site data

Solar power plant in Karlivka, Mykolaivskyi Raion, Mykolaiv Oblast

Karlivka: 1,204 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.5% above the oblast median (1,198). #221 of 238 in the rayon, #371 of 909 in the oblast.

Mykolayiv, the rayon centre, is 60 km away. 38 m above sea level. 26 km away: Bashtanka, the nearest bigger centre, the same 1,202. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 60 km. 9.88 m between rows, pitch 13.75 m (latitude 47.5°).

Yield of 1 kWp
1,204kWh/year
Tilt
36°3° east of south
10 kW
12,044kWh/year
Row pitch
13.75m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Karlivka

The designer opens with this place’s coordinates, latitude 47.5° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 60 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan53Feb100Mar125Apr139May141Jun154Jul150Aug126Sep97Oct49Nov34Dec

July: 154 kWh/kWp, December: 34 — 4.5 times less.

December: 34 against 33 in the oblast, 3.0% more.

Karlivka: plants, kWh
kWpA yearJulyDecember
56,022770170
1012,0441,540340
1518,0662,310510

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.