Solar plant: site data
Solar power plant in Hrazhdanivka, Pervomaiskyi Raion, Mykolaiv Oblast
Hrazhdanivka: 1,180 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.5% below the oblast median (1,198). #23 of 140 in the rayon, #709 of 909 in the oblast.
Pervomaysk, the rayon centre, is 39 km away. 145 m above sea level. 39 km away: Pervomaysk, the nearest bigger centre, 1,169 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 125 km. 10.01 m between rows, pitch 13.88 m (latitude 47.7°).
- Yield of 1 kWp
- 1,180kWh/year
- Tilt
- 36°4° east of south
- 10 kW
- 11,797kWh/year
- Row pitch
- 13.88m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Hrazhdanivka
The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 125 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 34 — 4.4 times less.
February: 51 against 54 in the oblast, 5.6% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,899 | 755 | 170 |
| 10 | 11,797 | 1,510 | 340 |
| 15 | 17,696 | 2,265 | 510 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Zakharivka2 km1,179 kWh/kWp
- Kopani4 km1,179 kWh/kWp
- Ivanivka5 km1,179 kWh/kWp
- Novooleksiyivka5 km1,182 kWh/kWp
- Novovasylivka6 km1,181 kWh/kWp
- Velykovesele7 km1,178 kWh/kWp
All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.