Solar plant: site data

Solar power plant in Horokhivske, Bashtanskyi Raion, Mykolaiv Oblast

Horokhivske: 1,238 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.3% above the oblast median (1,198). #17 of 279 in the rayon, #166 of 909 in the oblast.

Novyi Buh, the rayon centre, is 83 km away. 52 m above sea level. 16 km away: Snihurivka, the nearest bigger centre, 1,232 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 36 km. 9.53 m between rows, pitch 13.40 m (latitude 47.0°).

Yield of 1 kWp
1,238kWh/year
Tilt
36°3° east of south
10 kW
12,379kWh/year
Row pitch
13.40m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Horokhivske

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 36 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan60Feb106Mar127Apr141May143Jun152Jul152Aug128Sep98Oct52Nov37Dec

July: 152 kWh/kWp, December: 37 — 4.1 times less.

December: 37 against 33 in the oblast, 12.1% more.

Horokhivske: plants, kWh
kWpA yearJulyDecember
56,190760185
1012,3791,520370
1518,5692,280555

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bashtanskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.