Solar plant: site data

Solar power plant in Chervonyy Podil, Mykolaivskyi Raion, Mykolaiv Oblast

Chervonyy Podil: 1,243 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.7% above the oblast median (1,198). #120 of 238 in the rayon, #125 of 909 in the oblast.

Mykolayiv, the rayon centre, is 51 km away. 43 m above sea level. 14 km away: Berezanka, the nearest bigger centre, 1,260 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 51 km. 9.53 m between rows, pitch 13.40 m (latitude 47.0°).

Yield of 1 kWp
1,243kWh/year
Tilt
36°3° east of south
10 kW
12,425kWh/year
Row pitch
13.40m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Chervonyy Podil

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 51 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

43Jan59Feb107Mar128Apr143May143Jun152Jul150Aug127Sep100Oct52Nov38Dec

July: 152 kWh/kWp, December: 38 — 4.0 times less.

December: 38 against 33 in the oblast, 15.2% more.

Chervonyy Podil: plants, kWh
kWpA yearJulyDecember
56,213760190
1012,4251,520380
1518,6382,280570

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.