Solar plant: site data

Solar power plant in Tchernihivka, Voznesenskyi Raion, Mykolaiv Oblast

Tchernihivka: 1,201 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). Exactly the oblast median (1,198). #57 of 252 in the rayon, #415 of 909 in the oblast.

Voznesensk, the rayon centre, is 29 km away. 25 m above sea level. 24 km away: Berezivka, the nearest bigger centre, 1,217 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 86 km. 9.81 m between rows, pitch 13.68 m (latitude 47.4°).

Yield of 1 kWp
1,201kWh/year
Tilt
36°4° east of south
10 kW
12,007kWh/year
Row pitch
13.68m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Tchernihivka

The designer opens with this place’s coordinates, latitude 47.4° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 86 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan54Feb100Mar124Apr140May141Jun151Jul149Aug123Sep96Oct49Nov36Dec

July: 151 kWh/kWp, December: 36 — 4.2 times less.

December: 36 against 33 in the oblast, 9.1% more.

Tchernihivka: plants, kWh
kWpA yearJulyDecember
56,004755180
1012,0071,510360
1518,0112,265540

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Voznesenskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.