Solar plant: site data
Solar power plant in Bobryk, Pervomaiskyi Raion, Mykolaiv Oblast
Bobryk: 1,182 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.4% below the oblast median (1,198). #15 of 140 in the rayon, #681 of 909 in the oblast.
Pervomaysk, the rayon centre, is 46 km away. 136 m above sea level. 46 km away: Pervomaysk, the nearest bigger centre, 1,169 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 128 km. 9.98 m between rows, pitch 13.85 m (latitude 47.7°).
- Yield of 1 kWp
- 1,182kWh/year
- Tilt
- 36°4° east of south
- 10 kW
- 11,816kWh/year
- Row pitch
- 13.85m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 870 / 470Pa
Ground frame designer
A ground frame for a solar plant: Bobryk
The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 128 km: snow 870 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 150 kWh/kWp, December: 34 — 4.4 times less.
February: 51 against 54 in the oblast, 5.6% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,908 | 750 | 170 |
| 10 | 11,816 | 1,500 | 340 |
| 15 | 17,724 | 2,250 | 510 |
Example: a 10 kW ground frame
For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.
How these numbers are computed
Nearby
- Novovasylivka4 km1,181 kWh/kWp
- Kovalivka4 km1,186 kWh/kWp
- Velykovesele5 km1,178 kWh/kWp
- Bilyayeve5 km1,179 kWh/kWp
- Novopavlivka5 km1,180 kWh/kWp
- Sukhyy Ovrah5 km1,185 kWh/kWp
All places: Pervomaiskyi RaionMykolaiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.