Solar plant: site data

Solar power plant in Blahodarivka, Mykolaivskyi Raion, Mykolaiv Oblast

Blahodarivka: 1,240 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.5% above the oblast median (1,198). #136 of 238 in the rayon, #145 of 909 in the oblast.

Mykolayiv, the rayon centre, is 21 km away. 59 m above sea level. 21 km away: Mykolayiv, the nearest bigger centre, 1,253 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Миколаїв, 21 km. 9.54 m between rows, pitch 13.41 m (latitude 47.0°).

Yield of 1 kWp
1,240kWh/year
Tilt
36°3° east of south
10 kW
12,396kWh/year
Row pitch
13.41m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
870 / 470Pa

Ground frame designer

A ground frame for a solar plant: Blahodarivka

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Миколаїв, 21 km: snow 870 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan60Feb106Mar128Apr142May142Jun152Jul151Aug128Sep99Oct53Nov37Dec

July: 152 kWh/kWp, December: 37 — 4.1 times less.

December: 37 against 33 in the oblast, 12.1% more.

Blahodarivka: plants, kWh
kWpA yearJulyDecember
56,198760185
1012,3961,520370
1518,5942,280555

Snow and wind: Миколаїв

Example: a 10 kW ground frame

For the loads of Mykolaiv: 11.16 kWp, 18 panels, 372 kg of steel, 14 piles, materials ≈ 50,842 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mykolaivskyi RaionMykolaiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.