Solar plant: site data

Solar power plant in Yavoriv, Sambirskyi Raion, Lviv Oblast

Yavoriv: 1,043 kWh per kWp a year, tilt 37° 5° east of south (PVGIS). 3.8% below the oblast median (1,084). #194 of 264 in the rayon, #1398 of 1532 in the oblast.

Sambir, the rayon centre, is 60 km away. 774 m above sea level — above 500 m the DBN snow and wind are higher. 45 km away: Perechyn, the nearest bigger centre, 1,100 — 5.2% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 63 km. 11.22 m between rows, pitch 15.04 m (latitude 49.0°).

Yield of 1 kWp
1,043kWh/year
Tilt
37°5° east of south
10 kW
10,431kWh/year
Row pitch
15.04m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Yavoriv

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 63 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan59Feb90Mar108Apr114May118Jun126Jul126Aug103Sep81Oct46Nov30Dec

July: 126 kWh/kWp, December: 30 — 4.2 times less.

May: 114 against 124 in the oblast, 8.1% less.

Yavoriv: plants, kWh
kWpA yearJulyDecember
55,216630150
1010,4311,260300
1515,6461,890450

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sambirskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.