Solar plant: site data
Solar power plant in Shliakhetske, Sambirskyi Raion, Lviv Oblast
Shliakhetske: 1,039 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 4.1% below the oblast median (1,084). #210 of 264 in the rayon, #1421 of 1532 in the oblast.
Sambir, the rayon centre, is 33 km away. 376 m above sea level. 33 km away: Sambir, the nearest bigger centre, 1,074 — 3.2% less here. Snow and wind from the nearest regional centre in the DBN — Львів, 101 km. 11.89 m between rows, pitch 15.66 m (latitude 49.5°).
- Yield of 1 kWp
- 1,039kWh/year
- Tilt
- 38°1° east of south
- 10 kW
- 10,394kWh/year
- Row pitch
- 15.66m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,310 / 520Pa
Ground frame designer
A ground frame for a solar plant: Shliakhetske
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Львів, 101 km: snow 1,310 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 125 kWh/kWp, December: 32 — 3.9 times less.
November: 48 against 44 in the oblast, 9.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,197 | 625 | 160 |
| 10 | 10,394 | 1,250 | 320 |
| 15 | 15,591 | 1,875 | 480 |
Example: a 10 kW ground frame
For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.