Solar plant: site data

Solar power plant in Saikiv, Stryiskyi Raion, Lviv Oblast

Saikiv: 1,094 kWh per kWp a year, tilt 39° facing south (PVGIS). 1.0% above the oblast median (1,084). #79 of 286 in the rayon, #293 of 1532 in the oblast.

Stryi, the rayon centre, is 29 km away. 256 m above sea level. 29 km away: Stryi, the nearest bigger centre, 1,085 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Львів, 37 km. 12.18 m between rows, pitch 15.90 m (latitude 49.5°).

Yield of 1 kWp
1,094kWh/year
Tilt
39°facing south
10 kW
10,941kWh/year
Row pitch
15.90m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Saikiv

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Львів, 37 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb95Mar115Apr124May126Jun133Jul131Aug108Sep85Oct46Nov34Dec

July: 133 kWh/kWp, December: 34 — 3.9 times less.

December: 34 against 32 in the oblast, 6.3% more.

Saikiv: plants, kWh
kWpA yearJulyDecember
55,471665170
1010,9411,330340
1516,4121,995510

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Stryiskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.