Solar plant: site data

Solar power plant in Rykiv, Stryiskyi Raion, Lviv Oblast

Rykiv: 960 kWh per kWp a year, tilt 33° 3° east of south (PVGIS). 11.5% below the oblast median (1,084). #286 of 286 in the rayon, #1529 of 1532 in the oblast.

Stryi, the rayon centre, is 54 km away. 623 m above sea level — above 500 m the DBN snow and wind are higher. 51 km away: Drohobych, the nearest bigger centre, 1,073 — 10.6% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 83 km. 10.08 m between rows, pitch 14.09 m (latitude 48.9°).

Yield of 1 kWp
960kWh/year
Tilt
33°3° east of south
10 kW
9,595kWh/year
Row pitch
14.09m · GCR 0.34
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Rykiv

The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 83 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

23Jan52Feb85Mar104Apr113May116Jun124Jul123Aug99Sep77Oct33Nov10Dec

July: 124 kWh/kWp, December: 10 — 12.4 times less.

December: 10 against 32 in the oblast, 68.8% less.

Rykiv: plants, kWh
kWpA yearJulyDecember
54,79862050
109,5951,240100
1514,3931,860150

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Stryiskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.