Solar plant: site data

Solar power plant in Ruda Koltivska, Zolochivskyi Raion, Lviv Oblast

Ruda Koltivska: 1,075 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.8% below the oblast median (1,084). #153 of 180 in the rayon, #1191 of 1532 in the oblast.

Zolochiv, the rayon centre, is 10 km away. 270 m above sea level. 10 km away: Zolochiv, the nearest bigger centre, 1,081 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 54 km. 11.96 m between rows, pitch 15.78 m (latitude 49.9°).

Yield of 1 kWp
1,075kWh/year
Tilt
37°1° east of south
10 kW
10,748kWh/year
Row pitch
15.78m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Ruda Koltivska

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 54 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan54Feb90Mar114Apr125May129Jun134Jul132Aug108Sep82Oct37Nov31Dec

July: 134 kWh/kWp, December: 31 — 4.3 times less.

November: 37 against 44 in the oblast, 15.9% less.

Ruda Koltivska: plants, kWh
kWpA yearJulyDecember
55,374670155
1010,7481,340310
1516,1222,010465

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolochivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.