Solar plant: site data

Solar power plant in Podusiv, Lvivskyi Raion, Lviv Oblast

Podusiv: 1,064 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 1.8% below the oblast median (1,084). #354 of 356 in the rayon, #1316 of 1532 in the oblast.

Lviv, the rayon centre, is 55 km away. 314 m above sea level. 20 km away: Rohatyn, the nearest bigger centre, 1,094 — 2.7% less here. Snow and wind from the nearest regional centre in the DBN — Львів, 55 km. 11.43 m between rows, pitch 15.30 m (latitude 49.6°).

Yield of 1 kWp
1,064kWh/year
Tilt
36°4° east of south
10 kW
10,641kWh/year
Row pitch
15.30m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Podusiv

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Львів, 55 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan53Feb94Mar115Apr127May130Jun135Jul133Aug108Sep81Oct36Nov24Dec

July: 135 kWh/kWp, December: 24 — 5.6 times less.

January: 29 against 39 in the oblast, 25.6% less.

Podusiv: plants, kWh
kWpA yearJulyDecember
55,321675120
1010,6411,350240
1515,9612,025360

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lvivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.